Tacoma Narrows Bridge history - Bridge - Lessons from failure (2024)

Lessons from the failure of a great machine

How Galloping Gertie's collapse left us a lasting design legacy.

What's here?

  • The damage
  • First investigations - Partial answers to "why"
  • "Blind spot" - Design lessons of Gertie's failure
  • End of an era
  • Suspension bridge design since 1940
  • Why did Galloping Gertie collapse?
  • What if....
Tacoma Narrows Bridge history - Bridge - Lessons from failure (1)

The bridge in ruins, looking southwest, November 1940. The copyright in this image is the property of the Tacoma Public Library. Any additional copies or reproduction of this image are prohibited. All rights reserved

The damage

Tacoma Narrows Bridge history - Bridge - Lessons from failure (2)

A bridge inspector checks The damaged cable WSDOT

Main cables
During the collapse, the main suspension cables were thrown violently side to side, twisted, and tossed 100 feet into the air. They slipped from their positions in the cable saddles atop each tower. And, they fell hard on the approach spans. On the north cable at mid-span, where the cable band loosened, it broke more than 350 wires. Other wires were severely stressed and distorted. The main cables were a total loss, but salvage was undertaken. Their only value was as scrap metal.

Suspender cables
The violent collapse broke many suspender cables. Some were lost, some severely damaged, and some undamaged. Their only value now was as scrap metal.

Tacoma Narrows Bridge history - Bridge - Lessons from failure (3)

View of damaged cables and towers looking west, February 1943 WSDOT

Tacoma Narrows Bridge history - Bridge - Lessons from failure (4)

View from below the deck at buckled steel beams WSDOT

Tacoma Narrows Bridge history - Bridge - Lessons from failure (5)

M3-5 Sagging east side span GHM, Bashford 2795

Towers
The main towers (West Tower, #4; and East Tower, #5), including the bracing struts, were twisted and bent. Stress beyond the elastic limit of the metal resulted in buckling and permanent distortion. Their only value now was as scrap metal.

Deck-floor system
Not surprisingly, the concrete and steel of the center span that now lay on the bottom of the Narrows was deemed a total loss. The remainder of the broken concrete on the side spans needed removal. The floor system had sections that were bent and overstressed. Their only value now was as scrap metal.

Side spans
The loss of the center section, followed by the dropping of the side spans, caused substantial damage. The events stressed and distorted the plate girders and floor beams. Some buckled beyond repair.

Piers
Both the West Pier (#4) and the East Pier (#5) sustained no damage. The collapse of the center span caused partial sheering of rivets that attached the towers to the tops of the piers.

Anchorages
The anchorages for the main cables were undamaged. For building a replacement bridge, removal of part of the concrete would be necessary in order to spin the new main cables.

First investigations - Partial answers to "why"

The collapse of the 1940 Tacoma Narrows Bridge stunned everyone, especially engineers.How could the most "modern" suspension bridge, with the most advanced design, suffer catastrophic failure in a relatively light wind?

The State of Washington, the insurance companies, and the United States government appointed boards of experts to investigate the collapse of the Narrows Bridge. The Federal Works Administration (FWA) appointed a 3-member panel of top-ranking engineers: Othmar Amman, Dr. Theodore Von Karmen, and Glen B. Woodruff. Their report was the Administrator of the FWA, John Carmody and became known as the "Carmody Board" report.

In March 1941 the Carmody Boardannounced its findings. "Random action of turbulent wind" in general, said the report, caused the bridge to fail. This ambiguous explanation was the beginning of attempts to understand the complex phenomenon of wind-induced motion in suspension bridges. Three key points stood out:

(1) The principal cause of the 1940 Narrows Bridge's failure was its "excessive flexibility;"
(2) the solid plate girder and deck acted like an aerofoil, creating "drag" and "lift;"
(3) aerodynamic forces were little understood, and engineers needed to test suspension bridge designs using models in a wind tunnel.

"The fundamental weakness"of the Tacoma Narrows Bridge, said a summary article published in Engineering News Record, was its "great flexibility, vertically and in torsion." Several factors contributed to the excessive flexibility: The deck was too light. The deck was too shallow at 8 feet (a 1/350 ratio with the center span). The side spans were too long, compared with the length of the center span. The cables were anchored at too great a distance from the side spans. The width of the deck was extremely narrow compared with its center span length, an unprecedented ratio of 1 to 72.

The pivotal event in the bridge's collapse, said the Board, was the change from vertical waves to the destructive twisting, torsional motion. This event was associated with the slippage of the cable band on the north cable at mid-span. Normally, the main cables are of equal length where the mid-span cable band attaches them to the deck. When the band slipped, the north cable became separated into two segments of unequal length. The imbalance translated quickly to the thin, flexible plate girders, which twisted easily. Once the unbalanced motion began, progressive failure followed.

The investigation Board's most significant findingwas simple and obvious: the engineering community must study and better understand aerodynamics in designing long suspension bridges.

Meanwhile, Professor F. B. Farquharsoncontinued wind tunnel tests. He concluded that the "cumulative effected of undampened rhythmic forces" had produced "intense resonant oscillation." In other words, the bridge's lightness, combined with an accumulation of wind pressure on the 8-foot solid plate girder and deck, caused the bridge to fail.

Leon Moisseiff, who was contacted immediately after the failure, said he was "completely at a loss to explain the collapse." Moisseiff visited the ruined bridge one week later, touring under the watchful eye of Clark Eldridge. Moisseiff's design, while pushing beyond the boundaries of engineering practice, fully met the requirements of accepted theory at the time.

"Blind spot" - Design lessons of Gertie's failure

At the time the 1940 Narrows Bridge failed, the small community of suspension bridge engineers believed that lighter and narrower bridges were theoretically and functionally sound. In general, leading suspension bridge designers like David Steinman, Othmar Amman, and Leon Moisseiff determined the direction of the profession. Very few people were designing these huge civil works projects. The great bridges were extremely expensive. They presented immensely complicated problems of engineering and construction. The work was sharply limited by government regulation, various social concerns, and constant public scrutiny. A handful of talented engineers became pre-eminent. But, they had what has been called a "blind spot."

That "blind spot"was the root of the problem. According to bridge historian David P. Billington, at that time among suspension bridge engineers, "there seemed to be almost no recognition that wind created vertical movement at all."

The best suspension bridge designersin the 1930s believed that earlier failures had occurred because of heavy traffic loading and poor workmanship. Wind was not particularly important. Engineers viewed stiffening trusses as important for preventing sideways movement (lateral, or horizontal deflection) of the cables and the roadway. Such motion resulted from traffic loads and temperature changes, but had almost nothing to do with the wind.

This trend ran in virtual ignoranceof the lessons of earlier times. Early suspension bridge failures resulted from light spans with very flexible decks that were vulnerable to wind (aerodynamic) forces. In the late 19th century engineers moved toward very stiff and heavy suspension bridges. John Roebling consciously designed the 1883 Brooklyn Bridge so that it would be stable against the stresses of wind. In the early 20th century, however, says David P. Billington, Roebling's "historical perspective seemed to have been replaced by a visual preference unrelated to structural engineering."

Just four months after Galloping Gertie failed, a professor of civil engineering at Columbia University, J. K. Finch, published an article in Engineering News-Record that summarized over a century of suspension bridge failures. In the article, titled "Wind Failures of Suspension Bridges or Evolution and Decay of the Stiffening Truss," Finch reminded engineers of some important history, as he reviewed the record of spans that had suffered from aerodynamic instability. Finch declared, "These long-forgotten difficulties with early suspension bridges, clearly show that while to modern engineers, the gyrations of the Tacoma bridge constituted something entirely new and strange, they were not new--they had simply been forgotten."

An entire generationof suspension bridge designer-engineers forgot the lessons of the 19th century. The last major suspension bridge failure had happened five decades earlier, when the Niagara-Clifton Bridge fell in 1889. And, in the 1930s, aerodynamic forces were not well understood at all.

"The entire profession shares in the responsibility,"said David Steinman, the highly regarded suspension bridge designer. As experience with leading-edge suspension bridge designs gave engineers new knowledge, they had failed to relate it to aerodynamics and the dynamic effects of wind forces.

End of an era

The collapse of Galloping Gertieon November 7, 1940 revealed the limitations of the "deflection theory." Now, engineers no longer believed that suspension bridges needed to be stiffened only against the stress of moving vehicles and the "minor" effect of wind.

The failure of the Tacoma Narrows Bridgeeffectively ended Moisseiff's career. More importantly, it abruptly ended an entire generation of bridge engineering theory and practice, and the trend in designing increasingly flexible, light, and slender suspension spans.

Othmar Amman saidof the collapse of the 1940 Narrows Bridge, "Regrettable as the Tacoma Narrows Bridge failure and other recent experiences are, they have given us invaluable information and have brought us closer to the safe and economical design of suspension bridges against wind action."

Tacoma Narrows Bridge history - Bridge - Lessons from failure (6)

Aerial view of 1950 Narrows Bridge WSDOT

Suspension bridge design since 1940

"Mere size and proportionare not the outstanding merit of a bridge; a bridge should be handed down to posterity as a truly monumental structure which will cast credit on the aesthetic sense of present generations." - Othmar H. Amman, 1954

The end of the 1950switnessed the construction of two of the greatest suspension bridges in the world, built by two of the 20th century's greatest bridge engineers. The Mackinac Strait Bridge, which opened in November 1957 in Michigan, was the crowning achievement of David B. Steinman. In New York the Verazzano-Narrows Bridge, designed by Othmar Amman, was 10 years in the making and finally opened in November 1964. Both of these monumental spans directly benefited from the legacies of the failed 1940 and the successful 1950 Tacoma Narrows Bridges.

Over the course of the last 60 yearssince Galloping Gertie failed, bridge engineers have created suspension bridges that are aerodynamically streamlined, or stiffened against torsional motion, or both.

Now, wind tunnel testingfor aerodynamic effects on bridges is commonplace. In fact, the United States government requires that all bridges built with federal funds must first have their preliminary design subjected to wind tunnel analysis using a 3-dimensional model.

Failure of the 1940 Tacoma Narrows Bridgerevealed for the first time limitations of the Deflection Theory. Since the Tacoma disaster, aerodynamic stability analysis has come to supplement the theory, but not replace it. The Deflection Theory remains an integral part of suspension bridge engineering. Today, the theory's principles serve as a model for the complex analytical methods (such as "Finite Element" computer programs) used by structural engineers to calculate stresses in the suspension Cable system.

Since the 1990s, advances in computer graphics technology and high-speed processing have enabled such calculations to be performed on desktop computers. Today, engineers recognize the importance of a thorough aerodynamic analysis of the structures they design. Advanced modeling software programs assist the complex calculations.

Why did Galloping Gertie collapse?

For over six decades, engineers have studied the collapse of the 1940 Tacoma Narrows Bridge. The experts disagree, at least on some aspects of the explanation. A definitive description that meets unanimous agreement has not been reached. The exact cause of the bridge's failure remains a mystery.

Why is it important to knowthe exact cause of the 1940 bridge's collapse? Engineers need to know how a new suspension bridge design will react to natural forces. The more complete their understanding, the better their problem solving, and thus, the stronger and safer their bridge. The fact that engineers still argue about the precise cause of the Galloping Gertie's collapse is testimony to the extraordinary complexity of natural phenomena. Today, the 1940 Tacoma Narrows Bridge's failure continues to advance the "scientific method."

The primary explanationof Galloping Gertie's failure is described as "torsional flutter." It will help to break this complicated series of events into several stages.

Here is a summary of the key points in the explanation.

1. In general, the 1940 Narrows Bridge had relatively little resistance to torsional (twisting) forces. That was because it had such a large depth-to-width ratio, 1 to 72. Gertie's long, narrow, and shallow stiffening girder made the structure extremely flexible.
2. On the morning of November 7, 1940 shortly after 10 a.m., a critical event occurred. The cable band at mid-span on the north cable slipped. This allowed the cable to separate into two unequal segments. That contributed to the change from vertical (up-and-down) to torsional (twisting) movement of the bridge deck.
3. Also contributing to the torsional motion of the bridge deck was "vortex shedding." In brief, vortex shedding occurred in the Narrows Bridge as follows:

(1) Wind separated as it struck the side of Galloping Gertie's deck, the 8-foot solid plate girder. A small amount twisting occurred in the bridge deck, because even steel is elastic and changes form under high stress.
(2) The twisting bridge deck caused the wind flow separation to increase. This formed a vortex, or swirling wind force, which further lifted and twisted the deck.
(3) The deck structure resisted this lifting and twisting. It had a natural tendency to return to its previous position. As it returned, its speed and direction matched the lifting force. In other words, it moved " in phase" with the vortex. Then, the wind reinforced that motion. This produced a "lock-on" event.

4. But, the external force of the wind alone was not sufficient to cause the severe twisting that led the Narrows Bridge to fail.
5. Now the deck movement went into "torsional flutter."

"Torsional flutter"is a complex mechanism. "Flutter" is a self-induced harmonic vibration pattern. This instability can grow to very large vibrations.

Tacoma Narrows Bridge history - Bridge - Lessons from failure (7)

Tacoma Narrows Failure Mechanism - original sketch contributed by Allan Larsen

When the bridge movement changedfrom vertical to torsional oscillation, the structure absorbed more wind energy. The bridge deck's twisting motion began to control the wind vortex so the two were synchronized. The structure's twisting movements became self-generating. In other words, the forces acting on the bridge were no longer caused by wind. The bridge deck's own motion produced the forces. Engineers call this "self-excited" motion.

It was criticalthat the two types of instability, vortex shedding and torsional flutter, both occurred at relatively low wind speeds. Usually, vortex shedding occurs at relatively low wind speeds, like 25 to 35 mph, and torsional flutter at high wind speeds, like 100 mph. Because of Gertie's design, and relatively weak resistance to torsional forces, from the vortex shedding instability the bridge went right into "torsional flutter."

Now the bridge was beyond its natural abilityto "damp out" the motion. Once the twisting movements began, they controlled the vortex forces. The torsional motion began small and built upon its own self-induced energy.

In other words, Galloping Gertie's twisting induced more twisting, then greater and greater twisting.

This increasedbeyond the bridge structure's strength to resist. Failure resulted.

What if...?

Sometimes it is fun and worthwhile to ask the question, "What if...?," about important historical events. Here's one with an answer that may surprise you.

What if Clark Eldridge's original designfor the 1940 Tacoma Narrows Bridge had been built, instead of Leon Moisseiff's? Would it have blown down on November 7, 1940 like Galloping Gertie?

Tacoma Narrows Bridge history - Bridge - Lessons from failure (8)

Eldridge's design; elevation detail, May 23, 1938 WSA, WSDOT records

Answer:The bridge would still be there. That's the opinion of leading bridge engineers who have carefully studied Eldridge's design, with its 25-foot deep stiffening truss.

"I believe without a doubt," said one senior structural engineer, "that the bridge would have been aerodynamically stable for the wind speeds that destroyed Galloping Gertie."

Tacoma Narrows Bridge history - Bridge - Lessons from failure (2024)

FAQs

What did we learn from the Tacoma Narrows Bridge collapse? ›

Failure of the 1940 Tacoma Narrows Bridge revealed for the first time limitations of the Deflection Theory. Since the Tacoma disaster, aerodynamic stability analysis has come to supplement the theory, but not replace it. The Deflection Theory remains an integral part of suspension bridge engineering.

What design change caused the Tacoma Narrows Bridge to fail? ›

Three key points stood out: (1) The principal cause of the Narrows Bridge's failure was its "flexibility;" (2) the solid plate girder and deck acted like an airfoil, creating "drag" and "lift;" and (3) aerodynamic forces were little understood and engineers needed to test all suspension bridge designs thoroughly using ...

What could have prevented the Tacoma Narrows Bridge from collapse? ›

The solution would be to use deep, open stiffening trusses with trussed floor beams. The truss members would be shallow, to avoid creating any large, solid surfaces like the ones associated with the failure of the 1940 Narrows Bridge.

How many people died when Tacoma Narrows Bridge collapsed? ›

There were no human deaths in the collapse of the bridge. The only fatality was a co*cker Spaniel named Tubby, who perished after he was abandoned in a car on the bridge by his owner, Leonard Coatsworth.

What effect of resonance causes the failure of the Tacoma bridge? ›

When the wind drives the bridge to oscillate at its natural frequency, we say that they're in resonance. This causes the oscillations of the bridge to be amplified. In this case, the Tacoma Narrows Bridge's oscillations were amplified so much and for so long that its structure was not able to withstand the movement.

What are some facts about the Tacoma Narrows Bridge? ›

The bridge became famous as "the most dramatic failure in bridge engineering history." Now, it's also "one of the world's largest man-made reefs." The sunken remains of Galloping Gertie were placed on the National Register of Historic Places in 1992 to protect her from salvagers.

How was the Tacoma Narrows Bridge built differently? ›

The original Tacoma Narrows Bridge was the first to be built with girders of carbon steel anchored in concrete blocks; preceding designs typically had open lattice beam trusses underneath the roadbed. This bridge was the first of its type to employ plate girders (pairs of deep I-beams) to support the roadbed.

How deep is the water under the Narrows Bridge? ›

The water is over 200 feet deep. Swift, treacherous tides moving at over 8.5 miles per hour (12.5 feet per second) sweep through the channel four times a day.

How long did it take to rebuild the Tacoma Narrows Bridge? ›

Over the next 4½ years, TNC and WSDOT worked at a breathtaking pace to complete the project. The newest Tacoma Narrows Bridge opened to traffic in the early morning hours of July 16, 2007.

Why did the Tacoma Narrows Bridge collapse for kids? ›

The shallow and narrow girders are what caused the bridge to collapse. With such small girders, the deck of the bridge was not rigid enough. It was easily moved by the winds. The bridge was well known for its movement.

What is the main cause of bridge collapse? ›

Key Takeaways. Earthquakes, fires and train crashes are among the top causes of bridge collapses. Floods and boat impacts can also lead to collapses, either through immediate damage or by undermining support structures over time.

What caused the second Narrows Bridge to collapse? ›

In a subsequent Royal Commission inquiry, the bridge collapse was attributed to miscalculation by bridge engineers. A temporary arm, holding the fifth anchor span, was deemed too light to bear the weight.

Was the dog saved from the Tacoma Narrows Bridge? ›

"Tubby" the dog fell into fame when Galloping Gertie collapsed on November 7, 1940. As the only victim of that great disaster, Tubby has earned a special place in the hearts of many. His death symbolizes the drama of that terrible day. All that is known about the unfortunate pooch is here.

Do cargo ships go under the Tacoma Narrows Bridge? ›

Smaller, breakbulk cargo ships that primarily carry timber and bulk goods call at the Port of Olympia. They have to transit through the Narrows and under the Tacoma Narrows Bridge.

What was the nickname of the Tacoma Narrows Bridge collapse? ›

In early May 1940, when workers were building forms and laying concrete for the roadway, the Narrows Bridge began its soon-famous ripple. It was probably one of the "boomers" who dubbed the bouncing span, "Galloping Gertie." Local residents picked up the nickname and it stuck.

What was the purpose of building the Tacoma Narrows Bridge? ›

A strategic and military necessity. The 1940 Narrows Bridge was built "primarily as a military necessity" to link McChord Air Field south of Tacoma and the Puget Sound Navy Shipyard in Bremerton. This important fact is often is often overlooked today.

Why did the Tacoma Narrows Bridge bounce? ›

With such minimal girders, the deck of the bridge was insufficiently rigid and was easily moved about by winds; from the start, the bridge became infamous for its movement. A mild to moderate wind could cause alternate halves of the center span to visibly rise and fall several feet over four- to five-second intervals.

What is the biggest issue facing the Golden Gate Bridge in present times? ›

In present times, what is the biggest issue facing the Golden Gate Bridge? Corrosion and continual maintanence. (Components have been replaced to deal with corrosion issues and the bridge is continuously getting a fresh coat of paint.)

Top Articles
2018 Chevy Silverado 1500 5.3L Front End Torque Specs| Chevy Specs
Chevy Silverado 1500: Unveiling Lug Nut Size & Torque Specs for Optimal Performance
Mw2 Other Apps Vram
Smsgt Promotion List
Craigslist Apartments For Rent Cheap
Milkhater05 Of
Dr. Hannah Straight Website
Michigan Lottery Predictions For Today
Blowupgirls Thread
Cmx Cinemas Gift Card Balance
80 For Brady Showtimes Near Brenden Theatres Kingman 4
What You Need to Know About County Jails
Top Scorers Transfermarkt
Www. Kdarchitects .Net
Cassano's Pizza King Menu and Prices
Pokemon Fire Red Download Pc
Warped Pocket Dimension
Estragon South End
Swgoh Boba Fett Counter
4 Star Brewery
Where to Buy Fresh Masa (and Masa Harina) in the U.S.
Panic at the disco: Persona 4 Dancing All Night review | Technobubble
Icdrama Hong Kong Drama
P1 Offshore Schedule
Does Gamestop Sell Magic Cards
Watch The Lovely Bones Online Free 123Movies
636-730-9503
modelo julia - PLAYBOARD
Horseware Deken Amigo Bravo 100gr Donkerblauw - 130/183 | bol
Morgan Plus Four 2024 review
Squeezequeens
Spain
10 Top-Rated Tourist Attractions in Negril
Ontpress Fresh Updates
Shorkie: The Perfect Dog Breed for Families
Glassbox Eyecare
Mellow Mushroom Nutrition Facts: What to Order & Avoid
7066642123
Karen Ivery Reddit
Jennifer Brabson Cleek
Bible Gateway Lookup
Thotsbay New Site
The Next Phase for the V-22 Osprey: Build Global Support Like C-17
Uw Oshkosh Wrestling
450 Miles Away From Me
How Do I Change My Usaa Pin
Lagoon Pontoons Reviews
Restaurant Supply Store Ogden Utah
Wayfair Outlet Dayton Ohio
Lubbock Avalanche Journal Newspaper Obituaries
Yvi Eulb Meaning In Latin
Upgrading Fedora Linux to a New Release
Latest Posts
Article information

Author: Msgr. Benton Quitzon

Last Updated:

Views: 6521

Rating: 4.2 / 5 (63 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Msgr. Benton Quitzon

Birthday: 2001-08-13

Address: 96487 Kris Cliff, Teresiafurt, WI 95201

Phone: +9418513585781

Job: Senior Designer

Hobby: Calligraphy, Rowing, Vacation, Geocaching, Web surfing, Electronics, Electronics

Introduction: My name is Msgr. Benton Quitzon, I am a comfortable, charming, thankful, happy, adventurous, handsome, precious person who loves writing and wants to share my knowledge and understanding with you.